Metal Work and Policing Ground Loops

I took some time this afternoon to get the metal work completed (mostly) for the Source Selector Unit/Preamp. All the drilling is complete and everything is properly fit to the chassis. The only metal work left to do is four holes in the mounting brackets which need to be drilled and tapped. These four screws will hold the top plate in place and make swapping tubes easier.

[Read More]

Back to that Metal Work

Well, eleven days since my last post and the cedar fence is done, the garden is in, a toilet has been replaced, and a new batch of black cherry cider is in the fermenter. So I decided it was time to get back to the metal for the source selector unit.

[Read More]

Chassis Metal

I’ve been working on a whole bunch of different projects this last week. But I managed to carve out a little time to get all the chassis metal for the source selector unit cut to size, fit to the chassis, and marked for drilling.

[Read More]
Tags: chassis metal ssu 

About That Metal Work

I often get questions about how I design and construct my projects. One of the things I realized this morning, after receiving such a question, was that I really haven’t addressed my basic metal work and how I size all the aluminum parts I use for my chassis. So I thought I’d give a little insight into how I make these cuts and how I got to where I am today.

[Read More]

Some Metal Work

Before I perform the chassis glue up, I decided I wanted to get the two pieces of metal for the back drilled. This means I can make the pilot holes for the mounting screws in the inside of the back without having to work with a drill inside the glued up chassis. It’s a little thing but it makes the first assembly go that much smoother.

[Read More]
Tags: 12au7 chassis layout metal ssu