Many Delays

I’ve been pretty busy for the last month. But things are starting to move forward again. I’m still working on the project page for the Source Selector Unit and something new as well.

[Read More]
Tags: chassis maple ssu 

It's Truly Amazing

It really is amazing how much I can accomplish when suddenly I can’t work on all the projects which have been keeping me busy for the last month. The SSU assembly is complete and I’ve done some testing.

[Read More]
Tags: preamp ssu test testing 

An Opportunity

As it turns out, there is a crew working on painting the exterior of my house today. Since I can’t work on many of my outdoor projects around the house, I thought I’d take the opportunity to get a little done on the source selector unit.

[Read More]
Tags: chassis preamp ssu test testing 

Just a Quick Note

No, I haven’t fallen off the face of the Earth. And I realize that people are waiting for the completion of the Source Selector Unit. I just got unexpectedly busy.

[Read More]
Tags: chores ssu 

Fixing a Mistake

So last night I posted about a mistake I made in wiring the latest project. And because of when and where I made that mistake, it took all afternoon to correct it.

[Read More]
Tags: 12au7 mistake ssu wiring 

Signal Sections Fully Wired

Yesterday I was bottling mead but today I got a chance to wire up the buffers and tie in the coupling capacitors. This completes installation of all the signal chain components. All that’s left on the assembly is the final power supply wiring.

[Read More]
Tags: chassis mead preamp ssu test 

Tube Wiring Progress

Between regular chores, gardening, and yard work today I managed to steal a little time to make some progress on the latest project. The gain stages for the source selector unit are essentially complete and I’ll begin working on the buffers as soon as I can.

[Read More]
Tags: 12au7 preamp ssu tube wiring 

Always Check Your Work

While I was preparing to begin assembly of the vacuum tube circuits for the Source Selector Unit, I was quickly going over the design and pulling components. And this is when I became aware of a little problem with the buffer circuit.

[Read More]

First Oil on the Chassis

Today I got the shop cleaned up and applied the first coat of oil to the bubinga chassis for the Source Selector Unit. (Still looking for naming suggestions, by the way.) The oil really brings out the grain. I think it will look even better than I thought it would.

[Read More]
Tags: bubinga chassis finish oil ssu vu 

What's in a Name?

William Shakespeare famously wrote in the play Romeo and Juliet,

What’s in a name? That which we call a rose
By any other name would smell as sweet.

So this is my quandary today. What should I “officially” name my latest project?

[Read More]
Tags: bubinga names preamp ssu vu 

Metal Work and Policing Ground Loops

I took some time this afternoon to get the metal work completed (mostly) for the Source Selector Unit/Preamp. All the drilling is complete and everything is properly fit to the chassis. The only metal work left to do is four holes in the mounting brackets which need to be drilled and tapped. These four screws will hold the top plate in place and make swapping tubes easier.

[Read More]

Back to that Metal Work

Well, eleven days since my last post and the cedar fence is done, the garden is in, a toilet has been replaced, and a new batch of black cherry cider is in the fermenter. So I decided it was time to get back to the metal for the source selector unit.

[Read More]

Chassis Metal

I’ve been working on a whole bunch of different projects this last week. But I managed to carve out a little time to get all the chassis metal for the source selector unit cut to size, fit to the chassis, and marked for drilling.

[Read More]
Tags: chassis metal ssu 

Time for Metal Work

I’ve been catching up on all my spring chores and managed to steal a couple of hours in the shop this morning. The Source Selector Unit chassis is now all sanded. I also took the time to cut and fit the aluminum for the top and bottom plates. Now my attention will turn to getting all the holes laid out and drilled on the aluminum.

[Read More]

Chassis Decision Made

I actually spent a fair amount of time thinking about how to dress the chassis edges for the Source Selector Unit. But after much deliberation, a couple of scrap tests, and some evolution in thought as it progressed, I believe I’ve found a solution I really like.

[Read More]
Tags: bubinga chassis ssu 

How to Proceed

A good friend of mine, who’s opinion I value, has made a suggestion concerning the Source Selection Unit chassis. And I’m looking for some input.

[Read More]
Tags: bubinga chassis ssu 

Patience Pays Off

The chassis for the Source Selector Unit / Preamp is out of the clamps. I removed the clamps, cleaned up the little bit of glue squeeze out at the joints, and gave it a light sanding. It looks fantastic.

[Read More]
Tags: bubinga chassis ssu 

Some Metal Work

Before I perform the chassis glue up, I decided I wanted to get the two pieces of metal for the back drilled. This means I can make the pilot holes for the mounting screws in the inside of the back without having to work with a drill inside the glued up chassis. It’s a little thing but it makes the first assembly go that much smoother.

[Read More]
Tags: 12au7 chassis layout metal ssu