Before I perform the chassis glue up, I decided I wanted to get the two pieces of metal for the back drilled. This means I can make the pilot holes for the mounting screws in the inside of the back without having to work with a drill inside the glued up chassis. It’s a little thing but it makes the first assembly go that much smoother.
[Read More]Laughing At the 6L6 SE-UL Layout
I’ve been making an effort this morning to get my head around the internal layout of the 6L6 SE-UL amplifier. Unfortunately, I keep being stymied by the sheer physical size of many of the components.
[Read More]Design Decisions
So with the 6CY7 V2.0 Zebrawood amp finished and my 6L6UL project on the back burner, I’ve been working on a new SET amplifier. I have been thinking about an amp somewhere between my small SETs and the big 6336 SET amp. But I’ve run into a hiccough.
[Read More]